Montreal
Protocol-IS XII
B0550 -
Georgia - Tbilisi
REPORTING
PERIOD 2024
Narrative
REPORT
DATE: 22-06-2026
1.
Executive
Summary
XII phase of Institutional strengthening for implementation
of the Montreal Protocol (XI phase of IS project) is a 11th phase of enabling
activities for Georgia with an overall objective to strengthen Georgia’s
capacity in implementing obligations of the Montreal Protocol.
XII phase of IS project will assist Georgia in: i) updating existing legislation on ODS import quota to
cover all substances covered by the Montreal Protocol and its amendments ii)
improving Electronic Refrigerant Management System (ERMS) to include
refrigerants recovery, recycling, and reclamation operations; iii) quality and
timely reporting on ODS consumption and phase-out levels; iv) organizing
consultations with private sector representatives, including owners of HVAC/R
installations, importers, service companies, RAC technicians etc. around new
regulations on mandatory leak checks and ERMS; v) organizing information
dissemination campaign (including gender dimensions) on the introduction of
ERMS and mandatory leak detection through production of promotional and
publicity audio-visual and printed materials; vi) building knowledge and
capacities of HVAC/R installations, importers, service companies, RAC
technicians, and sellers of refrigerants in application of ERMS and
environmental inspectors in enforcement of mandatory leak checks and; vii)
further strengthening NOU’s internal managerial and external multi-stakeholder
coordination and networking capacities, through upgrading NOU’s infrastructure
and supporting GoG’s active participation in regional networks, open-ended
working group and meetings of parties.
2.
Background
On
21 March 1996, Georgia became a party to the Vienna Convention for the
Protection of the Ozone Layer and the Montreal Protocol on Substances that
Deplete the Ozone Layer, followed by the ratification of London, Copenhagen,
Montreal, Beijing and Kigali amendments to the Protocol by the country.
Since 2006 the United Nations Environmental Programme for Georgia (UNDP Georgia) has been pro-actively
assisting the Government of Georgia (GoG) in fulfilling ODS phase-out
obligations. More specifically, jointly with the Ministry of Environmental
Protection and Agriculture (MEPA), it has been carrying out the Institutional
Strengthening (IS) programme for the Implementation
of the Montreal Protocol. The IS supports the GoG in meeting its obligations
under the Montreal Protocol of the Vienna Convection, through implementing a number of horizontal and specific measures, including
legal-regulatory and policy, institutional strengthening (IS)/capacity building
(CB), public awareness, coordination, networking and regional and global
cooperation.
11 phases of IS Programme have
been already accomplished and the 12th phase will be
completed by the end of December 2026.
3.
Key Results
Achieved
In 2024, UNDP’s
implementation of IS XII projects focused on phasing out HCFCs under the
Montreal Protocol, with a complex context shaped by regulatory updates,
technological transitions, and capacity gaps. The government supported
compliance with its obligations under the Montreal Protocol by implementing new
mandatory requirements that entered into force step by step, beginning in
January 2024, following the ratification of the Kigali Amendment.
Capacity-building was prioritized, with extensive training for inspectors,
customs officers, and RAC technicians, alongside targeted gender inclusivity
efforts.
4.
Key Challenges
Encountered
Key challenges encountered
during the reporting period included limited willingness and capacity among
government counterparts to advance legal amendments regulating all Montreal
Protocol substances, as well as insufficient cross-agency coordination on cross-cutting
issues. In addition, limited interest and capacity among businesses to actively
engage in project activities remained a challenge. To address these issues, the
project continued close consultations with the National Ozone Office, MEPA’s
legal department, relevant government agencies, GARCAE and business
representatives, while also using Project Board discussions and planned
roundtables to strengthen coordination and stakeholder engagement.
5.
Project Risks
and Issues
1. GoG’s low willingness to develop legal amendments to
regulate all MP substances 2. Cross-agency cooperation on cross-cutting issues
is low 3. Business’s poor interest and capacity to participate in project
activities
6.
Lessons
Learned
Lessons learned show that
early and continuous consultations with the National Ozone Office, MEPA’s legal
department and other relevant government entities are essential for supporting
the development and advancement of draft regulations. Strong leadership by the
National Ozone Office through the Project Board is important to improve
cross-agency cooperation and address cross-cutting issues in a coordinated
manner.
7.
Conclusions
and Way Forward
Project
is on track. Project risks are monitored and
mitigation measures are in place.